![]() ![]() The second bridge is about 8 miles south of the existing bridge.Ĭlark County is a dynamic and innovative organization dedicated to providing top-quality service with integrity, respect and accountability. The existing bridge connecting Laughlin and Bullhead City is on north end of the cities. Fisher Sand and Gravel of Tempe, Ariz., is the contractor for the project. The bridge will cost $52.4 million, which includes $27.1 million from Clark County, $20.8 million from the federal government, and $4.5 million from Bullhead City. The bridge will be 724-feet long, and will include a 10-foot-wide multi-use path for pedestrians and bicyclists, in addition to travel lanes for vehicles. ![]() The new bridge is expected to be finished by the end of 2023, and will connect Needles Highway on the Nevada side to the southern portion of Bullhead Parkway on the Arizona side. Construction of the bridge, which will require significant work in the river, is expected to begin within the next two to three weeks. This bridge is an important transportation element, and it is also critical for emergency responders.”Ĭommissioner Naft represents Commission District A, which includes the unincorporated township of Laughlin.Īt this time, crews are clearing brush and other debris from the project area and staging equipment near the river. “The need for a second bridge connecting Laughlin and Bullhead City has been discussed and planned for decades, with federal funding first committed in the 1990s. “I am pleased to move this important infrastructure project forward,” Commissioner Michael Naft said. Work is underway on a new bridge that will provide emergency responders, residents and visitors with a second way to cross the Colorado River in Laughlin. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |